Scope of Work: The purpose of this project is to enhance pedestrian and bicycle safety and accessibility for students traveling to and from school. The proposed improvements support Safe Routes to School initiatives by strengthening pedestrian infrastructure, increasing motorist awareness within designated school zones…
General Construction & Renovation contracts in South Florida
General contracting, renovation, and unit-preparation work for public owners. Every listing below comes from an official public posting and is re-verified daily — when nothing is open in this category, this page says so plainly instead of filling the space. Get the digest and you'll hear the morning a match posts.
Request for Demolition for 2110 NW 100 ST
12 days left(Contractor must obtain and submit all permits prior to performing any work.) NOTE: THE USE OF EXPLOSIVES IS NOT PERMITTED UNDER THIS CONTRACT. 1-The contractor or any of its sub-contractors shall perform no work until all of the following conditions are met: A.…
Olympic Park - Walkway Repairs Rebid
13 days leftScope of Work – Furnish all labor, equipment and materials required to repair the asphalt walkways and various concrete pads throughout Olympic Park located at 8601 SW 152 Avenue, Miami, FL 33193. The work includes demolition, root pruning, debris removal, base compaction of approximately 865 SF of existing concrete wa…
Peace and Prosperity Rehab Program
14 days leftEliazar Cruz 16160 SW 305 Ter Homestead FL, 33033 (786) 765-6829 Exterior Repairs: Permits and inspections are required for all work 1) Re-Roof Complete: Pitched Deck Roofing General Specification All repairs and/or installations of new roof system shall comply with requirements of the Miami-Dade County Building Depart…
Peace and Prosperity Rehab Program
16 days leftDonal Coleman 14355 SW 92 Terr Miami FL, 33186 786-484-5927 Exterior Repairs: Permits and inspections are required for all work 1)Kitchen Cabinets Rehab: Provide materials and labor to remove existing kitchen cabinets, to include but not limited to remove of cabinets, backsplash, counter tops, sink. Demolish existing k…
REQUEST FOR CLARIFICATION/INFORMATION: All Requests for Information (RFI) must be submitted electronically, in word format, by 11/02/2026 to [email protected] and a copy filed with the Clerk of the Board at [email protected] NO PHONE CALLS WILL BE ACCEPTED. Verbal statements made by the County or the Owner’s Representa…
REQUEST FOR CLARIFICATION/INFORMATION: All Requests for Information (RFI) must be submitted electronically, in word format, by 11/02/2026 to [email protected] and a copy filed with the Clerk of the Board at [email protected] NO PHONE CALLS WILL BE ACCEPTED. Verbal statements made by the County or the Owner’s Representa…
REQUEST FOR CLARIFICATION/INFORMATION: All Requests for Information (RFI) must be submitted electronically, in word format, by 11/02/2026 to [email protected] and a copy filed with the Clerk of the Board at [email protected] NO PHONE CALLS WILL BE ACCEPTED. Verbal statements made by the County or the Owner’s Representa…
Contractor is required to include in project estimate cost, all labor work & materials associated with this SOW and described/noted in the RPQ. The new proposed replacement of existing Overhead Doors to be removed/demolished, fabrication and installation of new Four-Fold XT Exterior Bi-fold Doors at existing Apparatus…
MIA South Terminal Employee Restroom Renovation
25 days leftScope of Work shall include, but not be limited to: Provide all labor, equipment and materials for the renovation of an existing employee restroom at MIA South Terminal including related electrical, mechanical, plumbing and limited structural work. Selective interior demolition for male/female restrooms and janitor clo…
Scope of Work: 1) The project consists of reconstruction of the existing traffic circle at the intersection of SW 62 Avenue and SW 48 Street to improve operational efficiency, safety, and multimodal accessibility. The improvements will include geometric modifications to the traffic circle, installation of advance warni…
Don't refresh this page every morning. Get the scoop instead.
The free Scout digest emails your matches every Friday. Pro members get them daily at 7 AM.